01 | Marine works | Dredging and wrecks removal in Berth 9,10 & 11 in KAZ port for the oil importing activities | SOMO by PCO | March 2004 | Nov 2005 |
02 | River crossing | River crossing of 1×40” pipelines through shat Al Basra river for a depth in water of 13 meters | SCOP | July 2009 | May 2010 |
03 | River crossing | River crossing of 1×40” pipeline in West Qurna 2 Oilfield and 1×12” pipeline in Muthana Governorate (Samawa Depot) | SCOP | March 2006 | April 2007 |
04 | River crossing | River crossing of 2×48” pipelines and 2x 8” pipelines in West Qurna 1 oilfield beside K-bridge | SCOP state Co. for Oil projects | Oct 2008 | Sep 2009 |
05 | Dredging works | Dredging of the intake channel to Garmat Ali Water treatment plant and pumping station | South Oil Company | Nov 2008 | March 2009 |
06 | Eastern Base camp construction | Civil and building works for the 40 man base camp in Burjasiys | Eastern oilfield services, Kuwait | 15 March 2011 | 15 June 2011 |
07 | Building works | PROVISION OF ENGINEERING, PROCUREMENT , CONSTRUCTION AND COMMISSIONING OF GARRAF LIGHT OIL TRANSPORTATION SYSTEM (LOTS) PROJECT
PCIHBV/2012/DD/190 |
PCIHBV
|
22nd Apr. 2013 | 22nd July 2013 |
08 | Camp works | PROVISION OF ENGINEERING, PROCUREMENT AND CONSTRUCTION OF GARRAF BASE CAMP (GBC) WAREHOUSE FOR PRODUCTION CHEMICAL FOR PETRONAS CARIGALI IRAQ HOLDING B.V.
PCIHBV/2012/SCM/365 |
PCIHBV
|
3rd Feb. 2013 | 26th May 2013 |
09 | Electrical cables supply | Provision to supply and deliver of electrical cables for FCP offsite for PCIHBV
PCIHBV/2012/DD/298 |
PCIHBV
|
11 Oct. 2012 | 22th Feb. 2013 |
10 | Reverse osmosis systems | PROVISION TO SUPPLY AND DELIVER CONTAINERIZED REVERSE OSMOSIS (RO) FOR PETRONAS CARIGALI IRAQ HOLDING B.V
PCIHBV/2012/PRD/420 |
PCIHBV
|
3rd Mar. 2013 | 20th Apr. 2013 |
11 | T-Wall | Provision of supply and installation of T-wall at GBC for PCIHBV
PCIHBV/2012/DD/413 |
PCIHBV
|
9th Dec. 2012 | 3rd Apr. 2013 |
12 | Road works | Provision of Upgrading and Maintenance of Roads Leading Toward Landfill, River Water Intake & GA-4 for PETRONAS Carigali Iraq Holding B.V
PCIHBV/2012/DD/257 |
PCIHBV
|
9th August 2012 | 5th Feb. 2012 |
13 | Site civil works | Provision of civil work at well pad A, well pad B, and GA5 for PCIHBV
PCIHBV/2012/DD/287 |
PCIHBV
|
4th July 201 | 10th Sep. 2012
|
14 | Camp works | Provision of engineering, procurement, construction and commissioning of office in GBC for PCIHBV
PCIHBV/2012/DD/215 |
PCIHBV
|
10th May 2012 | 5th Sep. 2012 |
15 | Camp works | Provision of upgrading and maintenance of Block-B office building at GBC for PCIHBV
PCIHBV/2011/DD/088 |
PCIHBV
|
4th July 2011 | 30 Oct 2011 |
16 | Ahdeb Export Pipeline | Civil works for the pipeline construction and some station works for CP, 60 KM from Nasiriyah Depot to Tuba Tank Farm | China Petroleum Pipeline Bureau | 1 May 2011 | 15 Aug 2011 |
17 | Iraq crude oil export pipeline expansion project in FAO | civil works (ROW, excavation, bedding, padding, backfilling) of the on-shore pipeline.
Technical resources provisions (welders, fabricators, foremen, joint coating personnel, grinder, UT&RT inspectors, pipefitters,…etc). Supplying of construction equipments (welding machines, excavators, cranes, flat bed trucks). Supplying |
AHak International/ UNAOIL | June 2011 | 6 Feb 2013 |
18 | Patrol road construction | Patrol Road civil construction for Halfaya oilfield camp base in Missan | Petrochina Halfaya | 1 April 2011 | 1 June 2011 |
19 |
Station works
|
Strainer skids, surge skids installation and inlet valves for the water injection Cluster pumping stations (2,3,4,&5) in North Rumaila Field |
ROO/BP
|
25 Nov 2012
|
20 Oct 2013
|
20 |
Field roads
|
Upgrading and maintenance e of roads leading to landfill, water intake and GA-4 in Garraf oilfield |
PCIHBV
|
10 Sep 2012
|
10 Jan 2013
|
21 | Site Preparation & fence works | Site preparation and fence works, T-wall for the accommodation camp of Samsung in West Qurna Oilfield
|
Samsung engineering company LTD |
21 July 2012
|
30 October 2012
|
22 | Office complex
|
Modification of Petronas warehouse sheds into office for personnel
|
PCIHBV
|
12 May 2012
|
12 Aug 2012
|
23 | Grit Blasting and Painting works | Grit blasting and painting for the Zubair Oilfield in 6 DGS’s (Hammar, Zubair, Zubair Mishrif, Hammar Mishrif, and Rafidyah) | ENI Iraq Limited | 24 Oct 2012 | 23 Oct 2013 |
24 | Flowlines construction
|
Construction of pipelines in Majnoon Oil field
|
Shell
|
15 Feb 2013 | 15 July 2013 |
25 | Civil works for pipeline
|
Majnoon pipeline network
|
CPP
|
15 Jan 2012
|
Nov 2012
|
26 | Boundry wall construction
|
Construction of brick wall and main gates to the Halfaya base camp construction
|
PetroChina
|
15 Mar 2012
|
15 June 2012
|
27 | Flow lines works
|
Construction of flow lines in Rumaila Oilfield
|
ROO-BP
|
3 Feb 2012
|
3 July 2013
|
28 | Grit Blasting & painting
|
Scadffolding and painting works for the FAO station and Beach valves station for the Export expansion project
|
UNA-Oil
|
Dec 2011
|
Feb 2012
|
29 | Roads reconstruction
|
Removal of the existing road layer and replacement with new layers including the asphalting, lighting, signs and marking
|
PICHBV
|
15 Jan 2012
|
15 July 2012
|
30 | Scaffolding and internal cleaning of the tanks in DS1&2
|
Scaffolding works for SIPD inspection of tanks, paint removal, re-painting, internal cleaning, isolation works(confined spaces )
|
SIPD
|
13 June 2011
|
12 January 2013
|
31 | Station Civil works | Foundation and civil works for Majnoon Export pipeline facilities in Zubair Oilfield | AHAK/ Shell | 15 June 2013 | 15 Sep 2013 |
32 | CPI restoration | Water separation plant restoration in the 5 Degassing stations in Zubair Field, MEI works | ENI | 9 May 2012
|
2 Mar. 2014 |
33 | Dredging works
|
West Qurna 1 dredging works for the WTP intake on MOD | Saipem
|
1 June 2013
|
1 De 2013
|
34 | Site civil works | EARLY CIVIL WORKS FOR CAMP, LAYDOWN AREA AND ACCESS ROAD | Kuwait Energy Iraq Limited | Feb 2014 | June 2014 |
35 | Site Civil works | Security defence and anti- flood system for CPF2 area | Petrochina | July 2013 | Dec 2013 |
36 | Dredging works
|
West Qurna 1 dredging works for the WTP intake on MOD | Saipem
|
1 June 2013
|
1 Oct 2014
|
37 | Civil construction | Site and building works for the LukOil base camp in West Qurna 2 field | YoomYang / Samsung Eng. & Cpns. | Feb 2013 | Nov 2014 |
38 | Site civil works | Earth movement and embankment | Saipem | 1 July 2013 | 1 Sep 2014 |
39 | Mechanical & Electrical works | Fuel gas skid installation, and pump skids in the cluster pumping stations in CPS 1,2,3,4,&5 and Garmat Ali WTP | ROO/BP | Feb 2014 | Dec 2014 |
40 | Site civil works | Civil works for the field manifold areas M091- West Qurna 1 field | Saipem | Feb 2014 | Nov 2014 |
41 | Piling works | Piling works DS7 M095- ISBL water injection system | Saipem | Feb 2014 | Sep 2014 |
42 | road maintenance | SIPD1127 Majnoon Internal road maintenance | Shell | 16-03-2014 | 16 Nov 2014 |
43 | Civil work | EPC of GBC Drainage flood mitigation plan for PCIHBV | PCIHBV | Aug 2014 | Dec 2014 |
44 | Civil works | EPC of the early civil works for the well pads C,Q&J in Garraf Oilfield | PCIHBV | October 2014 | June 2015 |
45 | Accommodation camp | EPC for permanent accommodation camp | Kuwait Energy Iraq Limited | May 2014 | March 2015 |
46 | Civil, Turn key project | EPC for Multi Purpose hall in Garraf Base camp GBC
GAO/M&R/189/010 |
PCIHBV | Sep 2014 | June 2015
|
47 | Scaffolding works | Scaffolding provision services
SIPD 301 |
SIPD shell | May 2013 | Aug 2015 |
48
|
Pipeline repair works
|
Construction of pipelines in Majnoon Oil field, repair work | Shell
|
1 Feb 2013 | 31 Jan 2016
|
49 | Civil Work | early civil works for the well pads D in Garraf Oilfield | Grand Energy- PCIHBV | Sep-2015 | March-2016 |
50 | DGS’s in Zubair | Pressure Vessels internal cleaning, Repair and inspection | ENI
|
1 May 2012 | 2 Dec 2015 |
51 | Pipeline emergency repair | CN101599 Pipeline emergency repair works | ROO-BP | 6 July 2014 | 5 July 2016 |
52 | MEI works | Maintenance works for the DS1, DS2 and CPF
Contract # 1339 |
Shell-SIPD | Jan 2015 | June 2015 |
53 | Electrical and Instrument works | Electrical & Instrumentation works M095- ISBL water injection system | Saipem | June 2014 | Nov 2015 |
54 | Mechanical & Painting works | Mechanical and Painting works M095 ISBL water injection system. | Saipem | May 2014 | Oct 2015 |
55 | communication | TELECOMMUNICATION CONSTRUCTION WORKS | Saipem | March-2016 | Sep 2016 |
56 | Electrical and Instrument works | Electrical & Instrumentation works M075 MOD main outfull drain project | Saipem | May 2014 | Dec 2016 |
57 | Civil and construction works | Piling works, sheet piling, concrete for foundation and general civil works for the Main outful dran water treatment plant in West Qurna 1 | Saipem | 20 Oct 2013 | Dec 2016 |
58 | Civil construction works | HFY-CON-HSE-0778-0802 HAZARDOUS WASTE TEMPORARY STORAGE FACILITY | Petrochnia Iraq international FZE | 01 March 2017 | 31 May 2017 |
59 | Miscellaneous-2 Civil Work | Miscellaneous-2 Civil Work Duct Bank Concrete Work, etc in Iraq Zubair North New DGS Project | Samsung | 23 April 2016 | 31 Dec 2017 |
60 | ME Work | GRP Laminator works in Iraq Zubair North New DGS Project | Samsung | 27 Oct 2016 | 20 June 2017 |
61 | ME Work | Piping & painting work in water injection in Iraq Zubair North New DGS Project | Samsung | 15 Oct. 2016 | 20 Jun. 2017 |
62
|
Flow lines works
|
Construction of flow lines in Rumaila Oilfield | ROO-BP
|
1 Dec 2013
|
30 Nov 2016
|
63
|
Pipeline Maintenance and Repairs | Maintenance & Construction of pipelines in Majnoon Oil field, repair work SIPD-1496
|
Shell
|
Jan 2016 | Jan 2018 |
64 |
Engineering & supplying
|
Engineering, procurement and supervision on erection for the new water intake, WTP, and RO unit for Aumara Depot, Missan
|
SCOP
|
15 Oct 2012
|
15 May 2016
|